RIM TECH

Trenchless laying by drilling of a controlled water pipe made of PE 100 with a total length of 700 meters, and a gravity installation made of PP 280 Modular Pipes, 37 meters long. The drilling works were carried out in conditions requiring extensive experience and efficient organization of works in the road lane.