Kada-bis References

The scope of work included, among others:

  • installation of sections using PP225 pipes with a total length of 106.5 linear meters (178 pipes),

  • installation of sections using PP315 pipes with a total length of 40.5 linear meters,

  • works executed using trenchless methods — gravity auger boring technology.