ZUK LUBICZ

Trenchless construction of a sanitary sewage system from pipes:

  • PP 225x13.8x600 / 700 with a total length of 644m with a decrease of 0.5% in Krobia at ul. Długa (between DN1200 wells), the works were carried out in demanding soil and water conditions
  • PP 225x13.8x600 / 700 with a total length of 338m with a decrease of approx. 1% in Lubicz at ul. Dworcowa (between the wells DN1200)